4TH STABILISATION & SWEETING TRAIN
Image 5 Title

Primary contracts on Karachaganak Project



 Total Contract Amount   USD    183 261 817
 Executed Man-hours   MH   7 120 000
 Executed Equipment-hours        MH   1 250 000

SCOPE OF WORKS – PREVIOUS PROJECTS
 
Earth works  m3 800 000
Concrete works  m3 50 000
Steel structures  ton 12 000
Equipment manufacturing & installation  ton 500
Piping fabrication works  d/" 50 000
Piping erection works  d/" 100 000
Road works  km. 15
Roads and rivers crossings  No 100
Pipelines  km. 185
Piping  m. 14 000
E&I  km. 300
Tank works 2000  No. 7
Insulation  m2 15 000
Painting  m2 36 000
Auger Piling 600mm dia  No. 358

4th STABILISATION & SWEETENING TRAIN
EQUIPMENT & PIPEWORK ERECTION PROJECT

Total Contract Amount   USD  67 380 540
Executed Amount   USD 66 000 000
Executed Man-hours   MH 2 500 000
Executed Equipment-hours             MH 475 000

Activity types

Piping works                                    d/"     97 358
Piping Erection   ton   2 895
Pipe Support   ton   237
Equipments   ton   3118
Tanks   No.   2


 


 


 

 


 


Kashagan Development Project 2004 – 2010



Total Contracts Amount                 USD 146 929 346
Executed Man-hours  MH 11 255 280
Executed Equipment-hours   MH 2 353 000

SCOPE OF WORKS – SITE PREPARATION .

 Piling installation   No.   28 800 
 Concrete works  m3  11 360
 Site Preparation   m3  291 000
 Earth work  m3  114 000 
 Backfilling   m3  106 000 
 Road works   m3   7 100 
 Road crossings (p/sleeve & d/bank)     No.   172 
 Grouting       ton  155 
 Fencing   m.  12 000

SCOPE OF WORKS UTILITY PROJECT.

 Road crossings (p/sleeves & d/banks)  No.  62 
 Structural steel erection  ton  2 000
 Equipment erection works   ton  1 240 
 Boilers assembling & erection  No.  3 
 Piping works  d/"  60 000 
 Painting works   m2  24 000 
 Insulation works  m2  5 400
 Piling installation  No.  3 250 
 Concrete works   m3  20 000 
 Excavation  m3   151 000 
 Backfilling  m3  151 000
 Grouting        ton  55 
 U/G network manholes  No.  179 
 Piping works   d/"  220 000 
 Piping Fabrication   ton  1 600 
 Piping Erection  ton  3 100 
 Pipe Supports  ton  300 
 Painting works   m2  6 000 

SCOPE OF WORKS – PLANT MAIN WORKS. CIVIL WORKS.

 Piling installation  No.  21 700 
 Auger Bore Piles 450 mm.                    No.   105
 Concrete  m3  22 000
 Rebar  ton  1 850
 Excavation   m3  140 530
 Backfilling  m3  140 530